
Lunchtime project while telecommuting from Narnia. Needed to repair the Hart Systems Tank Tender system so that we can read water/fuel/waste levels (5 tanks total). System operates via air pressure. Needed to replace 2 valves(stuck open) and the air pump (precaution). Quick and easy repair (< 30 min) and all is working again.



Working on the Tank Tender